AIAHR Logo

Hard Hat Tour : Princess Anne Hospital



Owner Sentara Health Care
Architect HDR, Inc.
Contractor Whiting-Turner
Structural Engr. HDR, Inc.
Civil Engr. N/A
P/M/E Engr. HDR, Inc.
Building Area: 2 story vertical expansion, approximate 27.5K SF per floor
Percent Complete: Approximately 50%
Parking: Sentara Hospital Garage
Meeting Location: Whiting-Turner Trailer
Project Description:
  • 2 Story vertical expansion to the Sentara Princess Anne Hospital
  • The expansion consists of one shelled floor
  • One 24 bed Med Surge area.
  • Prefabbed Headwall units.
  • Tie-ins to existing infrastructures.
  • Extension of structural steel for future vertical expansion.
  • Hard Hats, proper footwear, safety glasses and vests are required.

Event Properties

Event Date 05-14-2018 4:00 pm
Event End Date 05-14-2018 5:30 pm
Registration Start Date 05-04-2018
Registered 13
Cut off date 05-14-2018 2:00 pm
Location
Sentara Princess Anne Hospital
2025 Glenn Mitchell Dr, Virginia Beach, VA 23456, USA
Sentara Princess Anne Hospital
47
We are no longer accepting registration for this event

Location Map

THANK YOU TO OUR SPONSORS

AIA Events Search

Category
Location

AIAHR Upcoming Events

There are no up-coming events

AIA Event Map

There are no events in the selected category