To join AIA, download an application at www.aia.org
Support our chapter!
For more information on sponsor opportunities and benefits, contact us at aiahr757@gmail.com or 1(757)356-9971
Hard Hat Tour : Princess Anne Hospital
Owner Sentara Health Care
Architect HDR, Inc.
Contractor Whiting-Turner
Structural Engr. HDR, Inc.
Civil Engr. N/A
P/M/E Engr. HDR, Inc.
Building Area: 2 story vertical expansion, approximate 27.5K SF per floor
Percent Complete: Approximately 50%
Parking: Sentara Hospital Garage
Meeting Location: Whiting-Turner Trailer
Project Description:
2 Story vertical expansion to the Sentara Princess Anne Hospital
The expansion consists of one shelled floor
One 24 bed Med Surge area.
Prefabbed Headwall units.
Tie-ins to existing infrastructures.
Extension of structural steel for future vertical expansion.
Hard Hats, proper footwear, safety glasses and vests are required.
Event Properties
Event Date
05-14-2018 4:00 pm
Event End Date
05-14-2018 5:30 pm
Registration Start Date
05-04-2018
Registered
13
Cut off date
05-14-2018 2:00 pm
Location
Sentara Princess Anne Hospital
2025 Glenn Mitchell Dr, Virginia Beach, VA 23456, USA